Critical Needs That Can't Wait
We urgently need your help to provide security, education, clean water, and proper shelter for 50+ orphaned children at Lillian Foundation.
CRITICAL URGENCY: These needs affect children's safety and wellbeing daily
Every contribution brings us closer to securing their future
Our Most Urgent Requirements
These four critical projects need immediate attention. Each addresses fundamental needs for the safety, education, health, and comfort of our children.
Perimeter Security Wall
Critical need for a secure boundary wall to protect our children from external threats and provide safe outdoor space.
Project Details:
- Length needed: 500 meters
- Height: 2.4 meters with barbed wire
- Materials: Stone blocks, cement, iron sheets
- Labor: Local skilled workers
- Timeline: 4-6 weeks
Direct Impact:
Provides security for 50+ children and prevents unauthorized access
Children's School Fees
Support education for 35 children currently in school. Many risk dropping out due to unpaid fees.
Project Details:
- 35 children need school fees
- Primary: 25 children @ $120/year each
- Secondary: 8 children @ $300/year each
- College: 2 students @ $800/year each
- Includes: Tuition, uniforms, books, supplies
Direct Impact:
Ensures continuous education and future opportunities for all children
Clean Water System
Install a complete water purification system including storage tanks, filtration, and piping.
Project Details:
- 10,000-liter storage tank
- UV water purification system
- Piping to all buildings
- 3 water dispensing points
- Maintenance for 2 years
Direct Impact:
Provides safe drinking water, reduces waterborne diseases by 80%
New Dormitories
Build additional dormitories to reduce overcrowding and provide proper sleeping arrangements.
Project Details:
- 2 new dormitory buildings
- Capacity: 40 children total
- Separate boys and girls sections
- Including: Beds, mattresses, lockers
- Proper ventilation and lighting
Direct Impact:
Ends overcrowding, provides privacy, improves sleep quality
Your Impact at a Glance
See how different contribution levels can make a difference
| Donation Amount | Perimeter Wall | School Fees | Clean Water | Dormitories |
|---|---|---|---|---|
| $25 | 5 concrete blocks | Books for 1 child | Water filter cartridge | 1 pillow & bedsheet |
| $100 | 2 meters of wall | 1 term for primary student | Water tap installation | Complete bed set |
| $500 | Security gate section | 1 year for secondary student | Small storage tank | Door & window set |
| $1,000 | Foundation for 10m wall | College semester tuition | Complete purification system | Room for 4 children |
| $5,000+ | Complete 50m wall section | Full education for 5 children | Water for entire center | Complete dormitory wing |
Pledge Your Support Today
Make a pledge now and our team will contact you within 24 hours with payment details. Your commitment helps us plan and prioritize these urgent projects.
Why Pledge Instead of Donate?
Making a pledge allows us to:
Plan Effectively
Know what resources are coming to schedule projects
Purchase Materials
Order building materials in bulk at better prices
Start Immediately
Begin preparatory work while awaiting funds
Pledge Process:
- Fill out this pledge form
- We contact you within 24 hours
- Choose payment method (Bank, M-Pesa, PayPal, etc.)
- Receive payment instructions
- Get regular updates on the project you supported
Quick Donation Options
Can't make a pledge right now? Here are quick ways to contribute
Bank Transfer
Account details available upon request
Project Implementation Timeline
How we plan to execute these critical projects based on funding
PHASE 1: IMMEDIATE (0-30 Days)
Perimeter Wall: Foundation Work
Begin surveying and foundation digging
School Fees: Emergency Payment
Clear most urgent school fee balances
PHASE 2: SHORT-TERM (1-3 Months)
Perimeter Wall: Construction
Complete 50% of wall construction
Water System: Installation
Install storage tank and purification system
PHASE 3: MEDIUM-TERM (3-6 Months)
Perimeter Wall: Completion
Finish entire wall with security features
Dormitories: Foundation & Structure
Begin construction of new dormitory buildings
PHASE 4: LONG-TERM (6-12 Months)
Dormitories: Completion
Furnish and occupy new dormitories
Education: Full Year Coverage
Secure all school fees for next academic year
Don't Let These Children Wait Any Longer
Every day without these basic needs puts children at risk. Your support can change that today.